繁中
Commencement of Yue Man Square PTI
To facilitate Kwun Tong Town Centre Redevelopment Project, termini or midway stops of PLB services in the vicinity of Yue Man Sq are relocated to Yue Man Square PTI with effective from 2 Apr 2021.
廣告 // 請往下繼續

Access Overview
Major Access
Description
A Yue Man Sq
Direct access to PTI (G/F) located near Yue Man Sq Rest Garden.
B Hong Ning Rd
Access via UG level of Yue Man Square mall. Take the escalator to G/F. Exit the mall for PTI (G/F).
C Mut Wah St
Take the escalator direct to PTI (G/F).
D Hip Wo St
Direct access to PTI (G/F) through the pavement next to the outbound vehicle access.
Other accesses
Lifts are available in Yue Man Square mall for access to PTI.
◉ Access on Mut Wah St.
Advertisement // scroll to continue

Original Terminus or Midway Stop at Yue Man Sq
Route
Path from Original Terminus or Midway Stop
Crossing Yue Man Sq. Access PTI thru Yue Man Sq Rest Garden.

Original Terminus at Kwun Tong Town Centre
Route
Path from Original Terminus
Crossing Yue Man Sq after taking the building's corridor. Access PTI thru Yue Man Sq Rest Garden.
Advertisement // scroll to continue

Original Terminus at Tung Yan St Interim PLB Terminus
Route
Path from Original Terminus
Proceed uphill along Hip Wo St. After passing the entrance of Yue Man Square mall, access PTI through the pavement next to the outbound vehicle access.
Route
Path from Original Terminus
Proceed uphill along Hip Wo St. After passing the entrance of Yue Man Square mall, access PTI through the pavement next to the outbound vehicle access.

Original Terminus or Midway Stop at Hip Wo St
Route
Path from Original Terminus or Midway Stop
Proceed uphill along Hip Wo St. After passing the entrance of Yue Man Square mall, access PTI through the pavement next to the outbound vehicle access.
Crossing Mut Wah St, take the escalator to PTI.
Route
Path from Original Terminus
Proceed uphill along Hip Wo St. Turn left for Mut Wah St and take the escalator to PTI.